File #: ID#19-297    Version: 1 Name:
Type: Action Item Status: Individual Consideration
File created: 6/5/2019 In control: City Council
On agenda: 6/18/2019 Final action:
Title: Consider approval, by motion, of Change in Service No. 1 with K. Friese and Associates for Engineering Services related to providing design and construction phase services for the CDBG-DR Midtown Drainage Improvements Phase 1 Project in the amount of $351,399.
Attachments: 1. 20190322_MidtownEastPh1A_graphic, 2. 20190612_MidtownEastPh1A_Design-Bid-Construction_Proposal_KFA.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval, by motion, of Change in Service No. 1 with K. Friese and Associates for Engineering Services related to providing design and construction phase services for the CDBG-DR Midtown Drainage Improvements Phase 1 Project in the amount of $351,399.

Body

Meeting date:  June 18, 2019

 

Department:  Engineering/CIP

 

Amount & Source of Funding
Funds Required:
  $351,399

Account Number:  13028132-56254 / MIDTOWN

Funds Available:  $4,190,000

Account Name:  CDBG-DR-Midtown Drainage Improvements Phase 1

 

Fiscal Note:
Prior Council Action: R2017-100R/On-Call Engineering Services CBDG-DR Projects; Contract#2018-197/Approving Master Agreement with K. Friese and Associates, Inc.

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Choose an item.

Choose an item.

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
Economic Development - Choose an item.
Environment & Resource Protection - Population Prepared for and resilient to Man-Made & Natural Disasters
Land Use - Choose an item.
Neighborhoods & Housing - Choose an item.
Parks, Public Spaces & Facilities - Well maintained public facilities that meet needs of our community
Transportation - Choose an item.

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Stormwater Master Plan

 

Background Information:

This project was ranked #1 of 4 infrastructure projects identified in the City of San Marcos CDBG-DR Infrastructure Feasibility Study performed by AECOM.   The scope of work for this change in service provides professional engineering services through final design and construction phase.

 

The Preliminary Engineering Report phase has been completed and the recommended improvements include curb cuts at the intersection of Aquarena Springs and the NB Frontage Road of IH35, improvements to existing drainage ditch including addition of a maintenance path, additional culverts under Davis Lane and a proposed outfall channel to the Blanco River.  Attached is a conceptual layout of the recommended improvements.

 

The PER level total construction cost estimate is $1,775,802.  The engineering fee for the Change in Service has been reviewed and approved for Cost Reasonableness in compliance with the CDBG-DR requirements.

 

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

N/A


Recommendation: 

Approve Change in Service No. 1