File #: Ord. 2019-04    Version: 1 Name:
Type: Action Item Status: Individual Consideration
File created: 11/28/2018 In control: City Council
On agenda: 1/29/2019 Final action:
Title: Receive a Staff Presentation and hold a Public Hearing to receive comments for or against Ordinance 2019-04, amending section 4.5.2.1(b)(2) of the City's Development Code to establish the Thompson/Cape Dam and Ditch Engineering Structure near the intersection of Cape Road and the San Marcos River as a Local Historic Landmark; and including procedural provisions; and consider approval of Ordinance 2019-04, on the first of two readings.
Attachments: 1. Ordinance, 2. ZC-18-20 Council Cover Memo, 3. ZC-18-20 Notification Map, 4. ZC-18-20 Property Owner List, 5. ZC-18-20 Aerial Map, 6. ZC-18-20 Staff Report, 7. ZC-18-20 Zoning Map, 8. ZC-18-20 National Register of Historic Places Nomination Form - 1985, 9. ZC-18-20 Approved Minutes from 10.4.18 HPC Meeting, 10. ZC-18-20 Staff Visit Photos, 11. ZC-18-20 Letter Received in Opposition, 12. ZC-18-20 Letters Received in Favor, 13. ZC-18-20 Presentation
AGENDA CAPTION:
Title
Receive a Staff Presentation and hold a Public Hearing to receive comments for or against Ordinance 2019-04, amending section 4.5.2.1(b)(2) of the City's Development Code to establish the Thompson/Cape Dam and Ditch Engineering Structure near the intersection of Cape Road and the San Marcos River as a Local Historic Landmark; and including procedural provisions; and consider approval of Ordinance 2019-04, on the first of two readings.
Body

Meeting date: January 29, 2019

Department: Planning and Development Services

Amount & Source of Funding
Funds Required: N/A
Account Number: N/A
Funds Available: N/A
Account Name: N/A

Fiscal Note:
Prior Council Action: N/A

City Council Strategic Initiative:
N/A

Comprehensive Plan Element (s):
? Economic Development
? Environment & Resource Protection
? Land Use
? Neighborhoods & Housing
? Parks, Public Spaces & Facilities
? Transportation
? Not Applicable

Master Plan:
N/A



Background Information:
In 1985, the property determined eligible for listing on the National Register of Historic Places (NRHP) under Criterion A for its significance to commerce and Criterion C for its engineering and design. The nomination form states that the Thompson/Cape Dam and Ditch Engineering Structure was constructed in 1867 to divert water from the San Marcos River to a manmade ditch in order to utilize water power from the river. According to the form the site consists of three components: the dam, the ditch, and the wheel pit and machinery platform. According to the nomination form, water power channeled by the dam and ditch was utilized between 1850 and 1942 to turn a waterwheel, later a turbine, to run a grist mill, a sawmill, a shingle machine and a cotton gin.

William Alexander Thompson was a planter in Mississippi and Louisiana before settling in Texas in 1850. He decided to build a mill along the San Marcos River and struck an agreement with John Francis McGehee to construct the dam at t...

Click here for full text