File #: Res. 2018-21R    Version: 1 Name:
Type: Resolution Status: Individual Consideration
File created: 1/24/2018 In control: City Council
On agenda: 2/20/2018 Final action:
Title: Consider approval of Resolution 2018-21R, awarding a design contract to Alan Plummer Associates, Inc. of 630 La Calma Drive, Suite 400, Austin, Texas; for the Sunset Acres Drainage Preliminary Engineering services, in the estimated amount of $187,900; authorizing the City Manager or his designee to execute the appropriate purchasing documents on behalf of the City; and declaring an effective date
Attachments: 1. Resolution, 2. signed contract, 3. PER project limits
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
AGENDA CAPTION:
Title
Consider approval of Resolution 2018-21R, awarding a design contract to Alan Plummer Associates, Inc. of 630 La Calma Drive, Suite 400, Austin, Texas; for the Sunset Acres Drainage Preliminary Engineering services, in the estimated amount of $187,900; authorizing the City Manager or his designee to execute the appropriate purchasing documents on behalf of the City; and declaring an effective date
Body
Meeting date: 2/20/2018

Department: Engineering & CIP

Amount & Source of Funding
Funds Required: $187,000
Account Number: C644
Funds Available: $200,000
Account Name: Sunset Acres Subdivision Study

Fiscal Note:
Prior Council Action: NA

City Council Goal: [Please select goal from dropdown menu below]
Goal #5 Maintain & Improve City's Infrastructure
Choose an item.
Choose an item.
Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
? Economic Development - Choose an item.
? Environment & Resource Protection - Choose an item.
? Land Use - Choose an item.
? Neighborhoods & Housing - Choose an item.
? Parks, Public Spaces & Facilities - Choose an item.
? Transportation - Choose an item.
? Not Applicable

Master Plan: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Choose an item.

Background Information:
The Sunset Acres storm drain system that currently serves the subdivision is undersized. The system drains to a trunk line within the Texas Department of Transportation (TxDOT) right-of-way. TxDOT is in the early stages of designing improvements to I35 in the area of Sunset Acres. The City has approached TxDOT about increasing the capacity of the trunk line along I35 to receive the 25-year flow from an upgraded storm drain system.
In addition to the storm drain system being undersized, several streets have been repaved such that the gutters have been filled, reducing the carrying capacity. Also, the slopes of the gutters are relativel...

Click here for full text