AGENDA CAPTION:
Title
Consider approval, by motion, of Change in Service #3, in the not to exceed amount of $333,392.67, to the Wallace Addition Water & Wastewater Improvements (Contract #215-212), with Klotz Associates, Inc. for providing surveying, preliminary engineering, design, bidding and construction phase services required for drainage improvements along Staples Road and within Wallace Addition.
Body
Meeting date: November 8, 2017
Department: Eng/CIP
Funds Required: $333,392.67
Account Number: C525
Funds Available: $333,392.67
Account Name: Wallace Addition Water & Wastewater Improvements
CITY COUNCIL GOAL: Maintain and improve the City's infrastructure.
COMPREHENSIVE PLAN ELEMENT(s):
Land Use
Goal 1 Direct growth, compatible with surrounding uses
LUG105 Align infrastructure plans to achieve preferred scenario
BACKGROUND:
The attached Change in Service #3 to Klotz Associates, Inc. in the amount of $333,392.67 will provide surveying, preliminary engineering, design, and bidding and construction phase services required for drainage improvements along Staples Road and within Wallace Addition.
This is the first of the expedited drainage projects to begin design. Klotz Associates has already completed 100% design plans for water and wastewater improvements on Staples Road and within the Wallace Additions Subdivision. This Change in Service adds the scope to address drainage issues that have been identified through the Stormwater Master Plan and from operational observation.
The CIS#3 covers the following:
* PER Phase including site visits, survey, watershed analysis, preliminary hydraulics and modeling, storm drain alignments, water quality needs, easements and land acquisition study, utility coordination, preliminary cost estimates, draft and final report;
* Design Phase services include survey, easement documents, geotechnical evaluation, design drawings for 60% and 90% submission, and cost estimates;
* Bidding Phase services include tech...