File #: Res. 2020-108R    Version: 1 Name:
Type: Resolution Status: Individual Consideration
File created: 5/4/2020 In control: City Council
On agenda: 6/2/2020 Final action:
Title: Consider approval of Resolution 2020-108R, approving a Change in Service to the engineering services agreement with Lockwood, Andrews & Newnam, Inc. relating to the Purgatory Creek Improvements Project in the estimated amount of $174,734.00 for a total contract price of $2,336,948.00; authorizing the City Manager or his designee to execute the appropriate purchasing documents to implement the change in service; and declaring an effective date.
Attachments: 1. Resolution - Change in Service Lockwood, Andrews & Newman - .pdf, 2. 200427_LAN_PURGCRKPH2_PermittingProposal.pdf, 3. USACE Phase 2 Area Project Location Map.pdf, 4. LAN Authorization of Change in Service.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2020-108R, approving a Change in Service to the engineering services agreement with Lockwood, Andrews & Newnam, Inc. relating to the Purgatory Creek Improvements Project in the estimated amount of $174,734.00 for a total contract price of $2,336,948.00; authorizing the City Manager or his designee to execute the appropriate purchasing documents to implement the change in service; and declaring an effective date.

 

Body

Meeting date:  June 2, 2020

 

Department:  CIP / Engineering, Director, Laurie Moyer (by Lynda Williams, Purchasing Manager)

 

Amount & Source of Funding
Funds Required:
  $174,734

Account Number:  C679

Funds Available:  $319,800

Account Name:  Purgatory Creek Improvements Phase 1

 

Fiscal Note:
Prior Council Action: December 3, 2019: Awarded professional engineering contract 218-307 to Lockwood, Andrews & Newnam, Inc. for an estimated amount of $1,694,774 to prepare 30 Percent Design Phase Engineering Services for the Purgatory Creek Improvements project.  On June 5, 2018, LAN, Inc. was awarded $467,440 to conduct preliminary engineering.

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Multi Modal Transportation

Choose an item.

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.
Land Use - Choose an item.
Neighborhoods & Housing - Choose an item.
Parks, Public Spaces & Facilities - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Choose an item.


Background Information:

The objective of the Purgatory Creek Improvement project is to reduce flooding along Purgatory from the San Marcos River to the discharge from the NRCS Flood Control Dam #5 at Wonder World Drive. Due to the extent of the work, multiple projects will be constructed beginning at the San Marcos River and working upstream.  The Purgatory Creek Improvement Project Phase I project limits will be from the San Marcos River to Johnson Avenue and the Phase 2 project limits is from Johnson Avenue to Wonder World Drive. 

As part of the project, a permitting pre-application meeting was held on January 22, 2020 to discuss permitting requirements for the Purgatory Creek Improvements project.  The meeting was attended by representatives from the US Army Corps of Engineers (UASCE), US Environmental Protection Agency (EPA), Texas Parks and Wildlife Department (TPWD), US Fish and Wildlife Services (USFWS), LAN’s team and City staff.  During the meeting, the USACE representative recommended the City consider the Phase 1 and Phase 2 areas as a single project and permit them together.

This change in service for USACE Permitting of the Phase 2 area includes the following:

                     Expands the project area to conduct permitting related tasks to include the Phase 1 and 2 areas (San Marcos River to Wonder World Drive).

                     Conduct similar services as currently authorized for the Phase 1 area including:

o                     USACE Section 404 Permit Compliance

o                     USACE Section 7 Consultation

o                     USACE Section 106 Permit Compliance

o                     Compliance with Antiquities Code of Texas

The estimated schedule to complete these USACE Permitting of the Phase 2 area will be completed with the original 30% Design phase (end of 2020). 

The project team, led by Lockwood, Andrews & Newnam, Inc. (LAN), completed a Preliminary Engineering report in May 2019.  On December 3, 2019, the City authorized LAN to develop 30% design plans for the Phase 1 area (San Marcos River to Jonson Avenue).  The project includes channel modifications for flood control, greenway trails for transportation connectivity, water quality, natural stream stability design for erosion prevention, replacement of road crossings, utility modifications, permitting and approval requirements, and construction cost estimates.

 

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommends approval of this change in service for LAN, Inc. in the amount of $174,734