Consider approval of Resolution 2022-99R, authorizing a Change in Service to the agreement with HDR Engineering, Inc. relating to the Loop 82 Reconstruction Project to increase the agreement in the amount of $13,245.00 for recent Rectangular Rapid Flashing Beacon specification revisions at the intersection of Loop 82 and Bobcat Stadium Drive; authorizing the City Manager or her designee to execute the appropriate documents to implement the Change in Service on behalf of the City; and declaring an effective date.
Body
Meeting date: May 17, 2022
Department: Engineering / CIP, Shaun Condor, Interim Director (by Lynda Williams, Purchasing & Contracts Manager)
Amount & Source of Funding
Funds Required: $13,245.00
Account Number: 50036338-70200
Funds Available: $508,364.70
Account Name: 219-063: Loop 82 & Bobcat Stadium Driveway Study
Fiscal Note:
Prior Council Action: Click or tap here to enter text.
City Council Strategic Initiative: [Please select from the dropdown menu below]
Community Safety
Choose an item.
Choose an item.
Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
☐ Economic Development - Choose an item.
☐ Environment & Resource Protection - Choose an item.
☐ Land Use - Choose an item.
☐ Neighborhoods & Housing - Choose an item.
☐ Parks, Public Spaces & Facilities - Choose an item.
☒ Transportation - Safe, Well coordinated transportation system implemented in an environmentally sensitive manner
☐ Core Services
☐ Not Applicable
Master Plan: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Choose an item.
Background Information:
This Authorization of Change in Service (ACIS) #3 is for $13,245 to provide final design modifications required due to the recent Rectangular Rapid Flashing Beacon (RRFB) specification revisions. This ACIS will cause the contract to exceed the $50,000 threshold for administrative approval. The original contract 219-063 with HDR consisted of a traffic study then two subsequent ACIS for final design, bid and construction phase services.
Following the construction completion of the Loop 82 Overpass, the need for a controlled intersection at the Bobcat Stadium driveway intersection became apparent during football games. Based on a traffic study performed by HDR a signalized intersection is not yet warranted but during football games an alternative of installing a Rectangular Rapid Flashing Beacon (RRFB) has been approved by TxDOT for this location. This area is within TxDOT right-of-way, and the chain of approval has been processed.
The construction was solicited for bids last year and the city received no bids due to an issue with TxDOT specifications. Since then, the issue has been resolved and the city has issued the solicitation for construction. Bids are due May 26, 2022.
This project is scheduled to start construction in mid-June with final completion anticipated prior to the Texas State football season in September. Construction cost is estimated at $68,931.05.
Council Committee, Board/Commission Action:
Click or tap here to enter text.
Alternatives:
Click or tap here to enter text.
Recommendation:
Staff recommends approval of this item.