File #: Res. 2026-09R    Version: 1 Name:
Type: Resolution Status: Individual Consideration
File created: 12/18/2025 In control: City Council
On agenda: 1/20/2026 Final action:
Title: Consider approval of Resolution 2026-09R, approving a Change Order to the construction contract with Payton Construction, Inc. for the Comanche Pump Station Improvements Project to add the replacement of deteriorated piping and inoperable valves in the amount of $304,763.00; authorizing the City Manager, or her designee, to execute the change order on behalf of the city; and declaring an effective date.
Attachments: 1. Resolution, 2. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2026-09R, approving a Change Order to the construction contract with Payton Construction, Inc. for the Comanche Pump Station Improvements Project to add the replacement of deteriorated piping and inoperable valves in the amount of $304,763.00; authorizing the City Manager, or her designee, to execute the change order on behalf of the city; and declaring an effective date.          

Body

Meeting date:  January 20, 2026

 

Department:  Engineering/Capital Improvements

 

Amount & Source of Funding
Funds Required:
  $304,763.00

Account Number:  C556

Funds Available:  Yes

Account Name:  Comanche Pump Station Improvements

 

Fiscal Note:
Prior Council Action: Res. 2024-139R, Award of Construction Contract

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Choose an item.

Public Safety, Core Services & Fiscal Excellence

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.
Land Use - Choose an item.
Neighborhoods & Housing - Choose an item.
Parks, Public Spaces & Facilities - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Water Master Plan


Background Information:

The attached change order for $360,000.00 to contract 224-007 with Payton Construction, Inc. will provide replacement of deteriorated piping and inoperable valves that were discovered during work on the Comanche Pump Station Improvements project and increase the total contract amount to $3,578,046.00.

 

In August of 2024 Council authorized the construction contract with Payton Construction, Inc. to upgrade the piping, valves, and pump replacement at the Comanche Pump Station which is major booster pump station in the water distribution system that maintains pressure for thousands of residents. 

 

During underground construction to upgrade discharge piping outside the pump house, deteriorated asbestos concrete piping and leaking valve were discovered which hampers the proposed yard piping completion.  The work will include installation of 6-inch diameter, 12-inch diameter, and 20-inch diameter ductile iron valves and piping to refeed a house and fire hydrant in the vicinity, demolition and abatement of asbestos concrete water pipe, and reconfiguration of the piping network and valving on the discharge piping for the Comanche Pump Station just downstream of the pump house.  The replacement of piping and valves will require multiple tie-ins to construct.

 

Construction will commence on the change order work immediately after authorization by Council and completion is anticipated by mid-April 2026.  This work will improve reliability and operational control of infrastructure directly downstream of the upgraded pump station.

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommends approval of this change order.