Legislation Details

File #: ID#26-820    Version: 1 Name:
Type: Work Session Item Status: Individual Consideration
File created: 11/10/2026 In control: City Council
On agenda: 12/1/2026 Final action:
Title: Receive a Staff presentation on the City’s Five-Year Sidewalk Maintenance Program for Fiscal Year 2027; and provide direction to the City Manager.
Attachments: 1. Sidewalk Presentation_Council_20261026, 2. 2027SidewalkMaintenancePlan, 3. Rolling 5 Year SW Plan_20261120, 4. Attachment C - 2025 Methodology for Prioritizing Sidewalk Maintenance with GIS Overlay Analysis, 5. 10-21 Neighborhood Commission Meeting Minutes, 6. CoSM Tree Ordinance, 7. Sidewalk Tree Mitigation SOP, 8. Postcard PS NC FY26 Final
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Receive a Staff presentation on the City’s Five-Year Sidewalk Maintenance Program for Fiscal Year 2027; and provide direction to the City Manager.

Body

Meeting date:  December 1, 2026

 

Department:  Public Works

 

Amount & Source of Funding
Funds Required:
  $289,193.05

Account or Project Number (C = CIP funds):  10006150-52505

Funds Available:  $289,193.05

Account Name:  Sidewalks

 

Fiscal Note:
Prior Council Action: Click or tap here to enter text.

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Public Safety, Core Services & Fiscal Excellence

Mobility & Connectivity

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]

N/A Arts and Culture - Choose an item.
N/A Economic Development -
Choose an item.
N/A Environment & Resource Protection -
Choose an item.

N/A Housing + Neighborhoods - Choose an item.
N/A Land Use + Community Design and Character -
Choose an item.
N/A Parks & Public Spaces + Health, Safety & Wellness -
Choose an item.
Yes Transportation -
Choose an item.

Yes Core Services

N/A Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Choose an item.


Background Information:

The Sidewalk Maintenance Program identifies, inspects, prioritizes, and repairs existing sidewalks that are unsafe or not compliant with the Americans with Disabilities Act (ADA). The program also supports City Council’s strategic initiative for a multimodal transportation system that improves accessibility and mobility, minimizes congestion, and reduces pollution. The program uses operational funds and a combination of in-house crews and contracted services to repair the City’s existing sidewalk infrastructure.

 

The Sidewalk Maintenance Program serves a different purpose than Capital Improvement Program (CIP) projects. Its objective is to preserve and repair the condition and accessibility of the City’s existing sidewalk network and extend the useful life of that infrastructure. Typical work includes replacing damaged sidewalk panels, removing trip hazards, repairing curb ramps, and filling short gaps between existing sidewalks. These projects are smaller in scale and can be completed within months. In contrast, CIP projects are larger efforts to expand or significantly improve the pedestrian network, such as constructing new sidewalk corridors, filling substantial gaps, or major reconstruction. These projects often require engineering design, environmental review, utility relocation, right-of-way acquisition, and permitting, and as a result require greater funding and longer timelines.

 

The program also plays an important role in the City’s ADA compliance. Federal regulations require municipalities to identify and remove barriers to accessibility within the public right-of-way. Through routine inspections and targeted repairs, the program addresses deficiencies such as deteriorated sidewalks, inaccessible curb ramps, and excessive cross slopes, and supports implementation of the City’s ADA Transition Plan. Because CIP projects take years to develop, the maintenance program provides a way to remove accessibility barriers as they are identified. Together, the maintenance program and CIP projects balance immediate repairs and ADA compliance with the long-term goal of expanding the City’s sidewalk network.

 

Using citizen feedback from public meetings, email requests, SMTX Connect requests, and GIS analysis, the Public Works Department develops a 5-Year Sidewalk Maintenance Plan. The plan prioritizes sidewalk issues in underserved and high pedestrian traffic areas, avoids tree conflicts, and fills short gaps between existing sidewalks. Once complete, all projects will meet ADA standards and improve accessibility and mobility for pedestrians across the City.

 

Council Committee, Board/Commission Action:
Neighborhood Commission - 10/21/2026

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommends council approval of FY 2027 5-Year Sidewalk Maintenance Plan