Title: Consider approval of Resolution 2026-106R, approving Change Order No. 3 to the contract with Guerra Underground, LLC for the Dunbar Water and Wastewater Improvement Project for asphalt paving repair upgrades in the amount of $476,665.00 for a total contract price of $7,397,390.07: authorizing the City Manager, or her designee, to execute the Change Order on behalf of the city; and declaring an effective date.
Attachments: 1. Resolution, 2. Utility Improvements Map.pdf, 3. Change Order 3.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2026-106R, approving Change Order No. 3 to the contract with Guerra Underground, LLC for the Dunbar Water and Wastewater Improvement Project for asphalt paving repair upgrades in the amount of $476,665.00 for a total contract price of $7,397,390.07: authorizing the City Manager, or her designee, to execute the Change Order on behalf of the city; and declaring an effective date.

Body

Meeting date:  July 7, 2026

 

Department:  Engineering/CIP

 

Amount & Source of Funding
Funds Required:
  $476,665.00

Account or Project Number (C = CIP funds):  C704

Funds Available:  Yes

Account Name:  Dunbar Utility Imps

 

Fiscal Note:
Prior Council Action: Res No. 2020-119R, Award of Preliminary Engineering Contract, Res No. 2021-190R, Award of Final Design Contract, RES 2024-127R, Construction Contract

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Public Safety, Core Services & Fiscal Excellence

Choose an item.

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]

Arts and Culture - Choose an item.
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.

Housing + Neighborhoods - Choose an item.
Land Use + Community Design and Character - Choose an item.
Parks & Public Spaces + Health, Safety & Wellness - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Choose an item.


Background Information:

The attached Change Order #3 for $476,665.00 to Construction Contract 223-277 with Guerra Underground, LLC will upgrade the paving repair from a typical trench repair to a full width (curb to curb) asphalt paving repair to the entire project.  This effort is associated with the Dunbar Water and Wastewater Improvement Project and the total contract amount would become $7,397,390.07.

 

This project is upsizing water and wastewater mains to a minimum of 8-in which is the current design standard.  The scope of work also includes the repaving of Faris, Wilson and MLK Drive since the pavement condition index (PCI) was less than 50.   The other streets were scheduled for a typical trench repair since the PCI score was above 50.   This change order adds additional streets to the full-width repair to avoid the need for future road repairs in the near future.   Sharrow bike lanes are proposed on San Antonio Street between Mitchell and S. Bishop Street.  The upgrades installed with this project will improve fire protection and potable water hydraulic conditions for the Dunbar neighborhood area as well improve roadway conditions. 

 

Construction is currently underway and is scheduled to be complete by September 2026. 

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommends approval of this item.