Skip to main content
File #: Res. 2021-224R    Version: 1 Name:
Type: Resolution Status: Individual Consideration
File created: 10/18/2021 In control: City Council
On agenda: 11/16/2021 Final action:
Title: Consider approval of Resolution 2021-224R, authorizing a Change Order to the contract with Austin Filter Systems, Inc., for the addition of Dog Beach maintenance repairs in the amount of $148,896.00 and adding a contingency in the amount of $100,000.00 to be added to the Rio Vista Falls Maintenance Project; authorizing the City Manager or his designee to execute the documents necessary to implement the Change Order; and declaring an effective date.
Attachments: 1. Resolution, 2. Dog Beach.pdf, 3. 221-011 Change Order #1 GS
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2021-224R, authorizing a Change Order to the contract with Austin Filter Systems, Inc., for the addition of Dog Beach maintenance repairs in the amount of $148,896.00 and adding a contingency in the amount of $100,000.00 to be added to the Rio Vista Falls Maintenance Project; authorizing the City Manager or his designee to execute the documents necessary to implement the Change Order; and declaring an effective date.

 

Body

Meeting date:  November 16, 2021

 

Department:  Engineering/CIP, Laurie Moyer, Director (by Lynda Williams, Purchasing Manager)

 

Amount & Source of Funding
Funds Required:
  $248,896

Account Number:  C743

Funds Available:  $248,896

Account Name:  Rio Vista Falls Maintenance Project

 

Fiscal Note:
Prior Council Action: March 2, 2021, Res. 2021-50, Contract Award to Austin Filter Systems, Inc.

City Council Strategic Initiative:  [Please select from the dropdown menu below]

N/A

Choose an item.

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.
Land Use - Choose an item.
Neighborhoods & Housing - Choose an item.
Parks, Public Spaces & Facilities - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Vision San Marcos - A River Runs Through Us


Background Information:

Rio Vista Falls was constructed in 2006 and since that time has received limited maintenance, despite resisting consistent strong currents and several floods.  In several locations underwater voids or undercuts have formed along the instream structures which require repair.  The proposed repairs include additional foundation anchoring and erosion protection armoring to create a more robust system. 

 

Change Order No. 1 consists of providing maintenance repairs to the Dog Beach area,  which is also experiencing undercutting, in the amount of $148,896.  The proposed repairs are similar to those proposed for Rio Vista Falls which include additional foundation anchoring and erosion protection armoring to create a more robust system.  The Dog Beach maintenance repairs are expected to begin once the Rio Vista Falls maintenance repairs are complete in March 2022.  The Dog Beach maintenance repairs will take approximately 2 months to complete.  Dog Beach and a portion of the river adjacent to Dog Beach will be inaccessible to the public during construction.  City Park side of the river will remain open and access up and down the river in this area will available. 

 

The change order also includes a contingency in the amount of $100,000 to address any unforeseen issues that occur during construction for both maintenance repair areas.  It is likely that any issues that come up will need to be addressed in a timely manner and not having the contingency in place could result in project delays.  Having a contingency for a capital improvement project is standard practice.  The contingency was included in Austin Filter Systems, Inc’s bid but was not awarded as part of the original Rio Vista Falls Maintenance Project construction approval provided in March of 2021 by City Council due to funds not being available at the time.

 

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommends approval of Change Order No. 1. In the amount of $248,896 to Austin Filter Systems, Inc.