File #: ID#17-738    Version: 1 Name:
Type: Action Item Status: Individual Consideration
File created: 10/9/2017 In control: City Council
On agenda: 11/8/2017 Final action:
Title: Consider approval, by motion, of Change in Service #3, in the not to exceed amount of $333,392.67, to the Wallace Addition Water & Wastewater Improvements (Contract #215-212), with Klotz Associates, Inc. for providing surveying, preliminary engineering, design, bidding and construction phase services required for drainage improvements along Staples Road and within Wallace Addition.
Attachments: 1. COSM Wallace Drainage Proposal_20171003, 2. drainage prj area.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval, by motion, of Change in Service #3, in the not to exceed amount of $333,392.67, to the Wallace Addition Water & Wastewater Improvements (Contract #215-212), with Klotz Associates, Inc. for providing surveying, preliminary engineering, design, bidding and construction phase services required for drainage improvements along Staples Road and within Wallace Addition.

Body

Meeting date:  November 8, 2017

 

Department: Eng/CIP

Funds Required:  $333,392.67

Account Number: C525

Funds Available:  $333,392.67

Account Name:  Wallace Addition Water & Wastewater Improvements

 

CITY COUNCIL GOALMaintain and improve the City’s infrastructure.

 

COMPREHENSIVE PLAN ELEMENT(s):

Land Use

Goal 1 Direct growth, compatible with surrounding uses

LUG105 Align infrastructure plans to achieve preferred scenario

 

BACKGROUND

The attached Change in Service #3 to Klotz Associates, Inc. in the amount of $333,392.67 will provide surveying, preliminary engineering, design, and bidding and construction phase services required for drainage improvements along Staples Road and within Wallace Addition.

 

This is the first of the expedited drainage projects to begin design.  Klotz Associates has already completed 100% design plans for water and wastewater improvements on Staples Road and within the Wallace Additions Subdivision.  This Change in Service adds the scope to address drainage issues that have been identified through the Stormwater Master Plan and from operational observation. 

 

The CIS#3 covers the following:

                     PER Phase including site visits, survey, watershed analysis, preliminary hydraulics and modeling, storm drain alignments, water quality needs, easements and land acquisition study, utility coordination, preliminary cost estimates, draft and final report;

                     Design Phase services include survey, easement documents, geotechnical evaluation, design drawings for 60% and 90% submission, and cost estimates;

                     Bidding Phase services include technical specifications, bid form and finalization of construction drawings, pre-bid conference, addenda, and review bids and make an award recommendation; and

                     Construction Phase services include construction documents preparation, pre-construction meeting, review shop drawings, request for information, assistance with change orders, construction meetings, periodic site visits, final walk through and punch list, and record drawings.

 

The design will occur in 2018 with construction anticipated in 2019. Staff recommends approval of this CIS.