File #: Res. 2025-135R    Version: 1 Name:
Type: Resolution Status: Individual Consideration
File created: 7/9/2025 In control: City Council
On agenda: 8/5/2025 Final action:
Title: Consider approval of Resolution 2025-135R, authorizing an Advanced Funding Agreement (AFA) with the Texas Department of Transportation, relating to the Wallace Addition Offsite Drainage Improvement Project, to provide for the installation of reinforced concrete box storm drain system along and across FM 621, within TxDOT right of way, with a cost to the city of $1,432,909.00; authorizing the City Manager, or her designee, to execute the appropriate documents to implement the AFA on behalf of the city; and declaring an effective date.
Attachments: 1. Resolution, 2. Location Map, 3. AFA
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2025-135R, authorizing an Advanced Funding Agreement (AFA) with the Texas Department of Transportation, relating to the Wallace Addition Offsite Drainage Improvement Project, to provide for the installation of reinforced concrete box storm drain system along and across FM 621, within TxDOT right of way, with a cost to the city of $1,432,909.00; authorizing the City Manager, or her designee, to execute the appropriate documents to implement the AFA on behalf of the city; and declaring an effective date.

Body

Meeting date:  August 5, 2025

 

Department:  Engineering & CIP

 

Amount & Source of Funding
Funds Required:
  $0.00

Account Number:  C731

Funds Available:  Yes                     

Account Name:  Wallace Addition Offsite Drainage Improvements

 

Fiscal Note:
Prior Council Action: Resolutions 2015-16R, 2019-243R, 2020-238R, 2021-214R, 2022-172R, 2023-13R, 2023-49R, 2024-71R.

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Quality of Life & Sense of Place

Public Safety, Core Services & Fiscal Excellence

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.
Land Use - Choose an item.
Neighborhoods & Housing - Choose an item.
Parks, Public Spaces & Facilities - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Stormwater Master Plan


Background Information:

An Advanced Funding Agreement (AFA) is required between the Texas Department of Transportation (TxDOT) and the City of San Marcos (City) to design and construct reinforced concrete storm drain infrastructure within the TxDOT right-of-way.

 

The City of San Marcos is currently working on the Wallace Addition Offsite Drainage Improvements project. The existing drainage infrastructure within and around Wallace Addition Subdivision is undersized and requires an upgrade. The scope includes design and construction of drainage infrastructure along and across Staples Road (FM 621), Cape Road, within the Fish Hatchery, and Hays County Cape Pond Park property to improve conveyance and reduce flooding in the neighborhood. 

 

A portion of this project occurs in TXDOT ROW and they require an AFA in order for the City to perform construction within their ROW. The City will be responsible for project design and construction costs in the estimated amount of $1,432,909.00. The city will also be responsible for the maintenance of locally owned facilities after the completion of the work.  TXDOT does not require any payment from the City per this AFA. 

 

Construction is expected to start in late 2026

 

Council Committee, Board/Commission Action:
NA

Alternatives:

NA


Recommendation: 

Staff recommends approval of this Resolution