File #: Res. 2023-115R    Version: 1 Name:
Type: Resolution Status: Individual Consideration
File created: 6/20/2023 In control: City Council
On agenda: 8/1/2023 Final action:
Title: Consider approval of Resolution 2023-115R, authorizing a Change in Service to the professional services agreement with Lockwood, Andrews & Newman, Inc. related to the Purgatory Creek Improvements Phase 1 project in the estimated amount of $825,756.35 for supplemental engineering services; authorizing the City Manager or her designee to execute the appropriate documents to implement the Change in Service on behalf of the City and declaring an effective date.
Attachments: 1. Resolution, 2. Purgatory_PermittingEasements_Proposal, 3. Exhibit Purgatory Phase 1 Properties, 4. Exhibit Purgatory Phase 2 Properties, 5. Exhibit Purgatory Site Location Map, 6. Authorization of Change in Service LAN No 6
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2023-115R, authorizing a Change in Service to the professional services agreement with Lockwood, Andrews & Newman, Inc. related to the Purgatory Creek Improvements Phase 1 project in the estimated amount of $825,756.35 for supplemental engineering services; authorizing the City Manager or her designee to execute the appropriate documents to implement the Change in Service on behalf of the City and declaring an effective date.

Body

Meeting date:  August 1, 2023

 

Department:  Engineering and Capital Improvements, Shaun Condor, Director

 

Amount & Source of Funding
Funds Required:
  $825,756.35

Account Number:  C679, 51036370-70200 and 50036370-70200

Funds Available:  $1,638,997.75

Account Name:  Purgatory Creek Improvements Phase 1

 

Fiscal Note:
Prior Council Action: June 5, 2018 Lockwood, Andrews & Newnam (LAN) Contract 218-307, was awarded $467,440 to conduct preliminary engineering services.  CIS#1 - on December 3, 2019, LAN was awarded $1,694,774 to conduct 30 Percent Design Phase Engineering Services.  CIS#2 - on June 2, 2020, LAN was awarded $174,734 to conduct additional environmental services requested by the US Army Corps of Engineers (USACE) as part of permitting. CIS#3 on May 11,2022, LAN was awarded $65,906.25 to conduct additional permitting requested by the USACE.  CIS#4 - on June 6, 2022, LAN was awarded $22,430 to conduct a benefit costs analysis services.  CIS#5 on August 15, 2022, LAN was awarded $7,068 to conduct property title research.

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Choose an item.

Environmental Protection

Mobility & Connectivity

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
Economic Development - Choose an item.
Environment & Resource Protection - Natural Resources necessary for community's health, well-being, and prosperity secured for future development
Land Use - Choose an item.
Neighborhoods & Housing - Choose an item.
Parks, Public Spaces & Facilities - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Flood Protection Master Plan


Background Information:

The attached Change in Service for $825,756.35 to Agreement 218-307 with Lockwood, Andrews and Newnam, Inc. (LAN) is to provide additional professional services including project management, preparation of FEMA CLOMR documents and submittal, supplemental field survey, easement acquisition, and supplemental environmental permitting services related to the Purgatory Creek Improvements Phase 1 project.

The purpose of the Purgatory Creek Improvements project is to provide flood mitigation considering natural channel designs, riparian and prairie restoration, vegetation management, improving water quality through storm water infiltration, and proposed shared-use trails that provide connectivity to adjacent park space and residential accessibility.  In addition, the project includes hydrologic and hydraulic analysis; bridge, road, and utility modifications, coordination with the Union Pacific Railroad; and permitting with various federal and state agencies.

The flood mitigation project designs are being conducted in two phases. Phase 1 is for the channel reach located between its confluence with the San Marcos River to an area near Johnson Avenue and Phase 2 is for the channel reach starting at Johnson Avenue to Wonder World Drive. For the Phase 1 area, 30% Level of Designs have been prepared, and for the Phase 2 area, conceptual designs were identified in a Preliminary Engineering Report.  Environmental permitting documentation is currently being prepared for both Phase 1 and 2 areas.  Easements and right-of-way acquisitions are being obtained for the entire Phase 1 area and for the Phase 2 trail area.

Services are expected to start September 2023 and be completed in 16 months, dependent on the review by other agencies including FEMA and the US Army Corps of Engineers.

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommends approval of change in services #6 to Lockwood, Andrews & Newman, Inc. in the amount of $825.756.35.