Consider approval of Resolution 2025-158R, approving Change Order No. 1 to the contract with Guerra Underground, LLC for the Dunbar Water and Wastewater Improvement Project in the amount of $604,034.24 for a total contract price of $6,889,344.96; authorizing the City Manager, or her designee, to execute the change order on behalf of the city; and declaring an effective date.
Body
Meeting date: September 2, 2025
Department: Engineering/CIP Department – Shaun Condor, Director
Amount & Source of Funding
Funds Required: $604,034.24
Account Number: C618-Drainage ($305,848.03), C704-WWW ($298,186.21)
Funds Available: Yes
Account Name: Various Drainage, Dunbar Utility Imps
Fiscal Note:
Prior Council Action: RES 2018-221R-Various Drainage Design Contract, RES 2024-162R-Various Drainage Rejection of Bids, RES 2024-127R-Dunbar Water and Wastewater Improvements Construction Contract
City Council Strategic Initiative: [Please select from the dropdown menu below]
Public Safety, Core Services & Fiscal Excellence
Choose an item.
Choose an item.
Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
☐ Economic Development - Choose an item.
☐ Environment & Resource Protection - Choose an item.
☐ Land Use - Choose an item.
☐ Neighborhoods & Housing - Choose an item.
☐ Parks, Public Spaces & Facilities - Choose an item.
☐ Transportation - Choose an item.
☒ Core Services
☐ Not Applicable
Master Plan: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Stormwater Master Plan
Background Information:
The attached Change Order to contract 223-277 with Guerra Underground LLC for the Dunbar Water and Wastewater Improvement Project in the amount of $604,034.24, will add additional scope to the Dunbar project associated with two (2) different tasks. One task will address scope changes on the Dunbar project and the second task will add scope associated with the Various Drainage Improvements project.
The first item it will address is changing the segmented base repair to full depth pavement reconstruction for Wilson and Faris Street on the Dunbar project. This also adds traffic control, valley gutter and concrete rip-rap for drainage repairs to the project. Total cost for the Dunbar project associated tasks is $298,186.21.
The second item it will address is adding in the scope associated with the previously bid Various Drainage Improvements project. This project bid was previously bid in June 2024 and all bids were rejected due to a non-response bid and a very high bid by resolution 2024-162R in September 2024. It is becoming very difficult to get reasonable bids on projects less than $500K and staff is using alternative strategies to get a fair project with competent contractors for City construction. The bids that were rejected in June 2024 were in the amount of $356,833.00 and $508,054.85. The contractor on Dunbar has submitted a price of $305,848.03 to complete this work. This cost is in-line with estimates provided in the design phase of the project.
The scope of Various Drainage Improvements project includes construction of drainage improvements for three project locations. Project 1 - Bishop Street at Prospect consists of new storm sewer drainage and inlets. Project 2 - S. LBJ Culvert includes repairing the street culvert crossing over Willow Springs. Project 3 - Craddock Avenue consist of a new outfall from an existing drainage ditch to an existing storm sewer system located on Craddock Avenue. All three are scheduled to add an additional 3 months to the Dunbar project. This work will not begin until the Dunbar project is substantially complete and streets are in good condition.
Council Committee, Board/Commission Action:
N/A
Alternatives:
N/A
Recommendation: