Title: Consider approval of Resolution 2026-54R, awarding a contract to Liberty Civil Construction, LLC, for the Highway 80 Utility Project, to connect the proposed lift station, force main, and reclaimed transmission main to pipelines previously constructed with the Blanco Riverine Flood Mitigation Project, in the amount of $13,550,404.24; authorizing the City Manager, or her designee, to execute the contract on behalf of the city; and declaring an effective date.
Attachments: 1. Resolution, 2. Hwy 80 Utility Project ARF Map, 3. Hwy 80 - Recommendation of Award Letter, 4. 2025-121 Bid Tabulation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2026-54R, awarding a contract to Liberty Civil Construction, LLC, for the Highway 80 Utility Project, to connect the proposed lift station, force main, and reclaimed transmission main to pipelines previously constructed with the Blanco Riverine Flood Mitigation Project, in the amount of $13,550,404.24; authorizing the City Manager, or her designee, to execute the contract on behalf of the city; and declaring an effective date.

Body

Meeting date:  April 7, 2026

 

Department:  Engineering and Capital Improvements

 

Amount & Source of Funding
Funds Required:
  $13,550,404.24

Account or Project Number (C = CIP funds):  C555

Funds Available:  Yes

Account Name:  Hwy 80 Lift St & 10-Inch Force Main

 

Fiscal Note:
Prior Council Action: 2021-99R Award of Engineering Contract, 2022-131R Change In Service No. 1, 2023-48R Change In Service No. 2

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Public Safety, Core Services & Fiscal Excellence

Choose an item.

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]

Arts and Culture - Choose an item.
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.

Housing + Neighborhoods - Choose an item.
Land Use + Community Design and Character - Choose an item.
Parks & Public Spaces + Health, Safety & Wellness - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Wastewater Master Plan


Background Information:

On February 12, 2026, nine (9) bids were received for the Highway 80 Utility Project IFB# 2025-121. Liberty Civil Construction, LLC was the apparent low bidder with a total base bid of $13,550,404.24 for Combined Lift Station and Pipeline Package (C) Total Base Bid Plus Alternate. Based on their qualifications and references, they appear to be qualified to perform the work on this project.

 

The wastewater lift station and force main were identified as a priorities in the 2015 and 2025 Wastewater Master Plans to address capacity issues due to growth north and east of the Blanco River.  The reclaimed water main was identified in the 2013 and 2026 Reclaimed Water Master Plans.  Once this lift station is operational, there are several additional wastewater projects that will need to be completed upstream in the northeastern part of town to relieve strained infrastructure that currently serves this area.

 

Bids have been received for the construction contract in the $13-$15 million range and construction is expected to start in May 2026 to connect the proposed lift station, force main, and reclaimed transmission main to pipelines that were previously constructed with the Blanco Riverine Flood Mitigation east of the Blanco River.  The construction is expected to take approximately 2 years to complete; contingent up on weather.

 

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommend approval of this contract.