Skip to main content
File #: Res. 2025-115R    Version: 1 Name:
Type: Resolution Status: Individual Consideration
File created: 6/4/2025 In control: City Council
On agenda: 7/1/2025 Final action:
Title: Consider approval of Resolution 2025-115R, approving a Change in Service to the contract with Quiddity Engineering, LLC, for the University Drive Water Line Replacement Project, to include bid phase services, construction phase services, and archaeological monitoring as required by Texas Historical Commission in an amount not to exceed $53,083.00; authorizing the City Manager, or her designee, to execute the appropriate documents to implement the Change in Service; and declaring an effective date.
Attachments: 1. Resolution, 2. 224-265 University Dr Water Replacement ACIS 01, 3. Map-UniversityWaterLine
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2025-115R, approving a Change in Service to the contract with Quiddity Engineering, LLC, for the University Drive Water Line Replacement Project, to include bid phase services, construction phase services, and archaeological monitoring as required by Texas Historical Commission in an amount not to exceed $53,083.00; authorizing the City Manager, or her designee, to execute the appropriate documents to implement the Change in Service; and declaring an effective date.

Body

Meeting date:  July 1, 2025

 

Department:  Engineering and CIP - Shaun Condor, Director

 

Amount & Source of Funding
Funds Required:
  $53,083.00

Account Number:  C720-WWW-CASH-13200; 52092412-70200

Funds Available:  Yes

Account Name:  Project C720 University Dr Water Replacement

 

Fiscal Note:
Prior Council Action: N/A

City Council Strategic Initiative:  [Please select from the dropdown menu below]

City Facilities

Choose an item.

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.
Land Use - Choose an item.
Neighborhoods & Housing - Choose an item.
Parks, Public Spaces & Facilities - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Water Master Plan


Background Information:

The City of San Marcos authorized Quiddity Engineering to design the replacement of approximately 1,500 linear feet of existing 12-inch water main located along University Drive, between Aquarena Springs Drive and CM Allen Parkway (PSA #224-265). The design is currently at the 60% phase.

 

During environmental coordination, the Texas Historical Commission (THC) determined that archaeological monitoring will be required during construction due to the projects location. Additionally, bidding and construction phase services were not included in the original contract but are now necessary to support project delivery.

 

This Authorization of Change in Service, ACIS 1, will amend the existing agreement to include:

-                     Archaeological monitoring during construction, as required by the THC;

-                     Bidding and construction phase services; and

-                     Record drawings

 

These additional services are essential to ensure proper coordination and oversight through the remainder of the project.

 

Original Contract Amount: $95,775.00

Previous Increases in Contract Amount: $0.00

This Increase in Contract Amount: $53,083.00

Revised Contract Amount: $148,858.00

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommends approval.