File #: CUP-19-11    Version: 1 Name:
Type: Action Item Status: Reported to Council
File created: 4/8/2019 In control: Planning and Zoning Commission
On agenda: 5/28/2019 Final action:
Title: CUP-19-11 (Purpose Built Student Housing) Hold a public hearing and consider a request by 75 Sylvan Street for a Conditional Use Permit to allow a Purpose Built Student Housing development on located on Guadalupe Street between San Antonio Street and MLK Drive. (W. Parrish)
Attachments: 1. CUP-19-11 Aerial Map, 2. CUP-19-11 Notification Map, 3. CUP-19-11 Staff Report, 4. CUP-19-11 Applicants Justification, 5. CUP-19-11 Rendering, 6. 5 Story Guadalupe Elevation.pdf, 7. CUP-19-11 5 Story Alley Elevation.pdf, 8. CUP-19-11 Floor/Site Plans, 9. CUP-19-11 Application, 10. Guadalupe Cross Section, 11. MLK Cross Section, 12. San Antonio Cross Section, 13. CUP-19-11 Opposition Letter, 14. CUP-19-11 Presentation

AGENDA CAPTION:

Title

CUP-19-11 (Purpose Built Student Housing) Hold a public hearing and consider a request by 75 Sylvan Street for a Conditional Use Permit to allow a Purpose Built Student Housing development on located on Guadalupe Street between San Antonio Street and MLK Drive. (W. Parrish)

Body

Meeting date:  May 28, 2019

 

Department:  Planning and Development Services

 

Amount & Source of Funding
Funds Required:
  N/A

Account Number:  N/A

Funds Available:  N/A

Account Name:  N/A

 

Fiscal Note:
Prior Council Action: N/A

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Choose an item.

Choose an item.

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.
Land Use - Choose an item.
Neighborhoods & Housing - Choose an item.
Parks, Public Spaces & Facilities - Choose an item.
Transportation - Choose an item.

Not Applicable
Master Plan
:
Downtown Master Plan

Background Information:

The properties included in this request are currently owned by multiple individuals and consists of retail, restaurant, office, and commercial uses. The applicant currently has these properties under contract.

Recommendation: 

Staff has reviewed the request against the criteria from Sections 2.8.3.4 and 5.1.4.9 and recommends approval with the following conditions:

 

1.                     Approval of this request for “Purpose Built Student Housing” does not waive any development code regulations, whether or not they are represented in the submitted back up material;

 

2.                     Any proposed building must meet the requirements of all City Codes and Ordinances;

 

3.                     Streetscape improvements shall be required to extend to the intersection of San Antonio and Guadalupe Street;

 

4.                     There shall be no balconies or patios permitted on the building facing Telephone Alley;

 

5.                     The Pedestrian Passage shall be a minimum of two stories in height, with pedestrian level entrances on both sides, sufficient internal lighting, and a minimum glazing requirement of 70% on the club house and lobby walls facing the Pedestrian Passage;

 

6.                     The applicant shall work with the City to mitigate noise and light nuisances associated with the parking garage;

 

7.                     There shall be a minimum of one operable building entrance / exit every 100 feet (on average) along the street frontage;

 

8.                     Smoke barriers shall be provided to subdivide every story that contains R-2 occupancies, into no fewer than two smoke compartments.  Such stories shall be divided into smoke compartments of not more than 22,500 square feet;

 

9.                     A means of egress shall be provided from each smoke compartment created by smoke barriers without having to return through the smoke compartment from which means of egress originated;

 

10.                     All plans shall be reviewed, at the expense of the permit applicant, by a third party, as approved by the COSM, for compliance with the fire codes as adopted by the COSM.  Any expenses for the plans review shall be the responsibility of the permit applicant and paid   directly to the third party.  The cost of these expenses are in addition to any permit fees required by the COSM.  Final approval of the submitted plans shall remain the authority of the COSM;

 

11.                     Full dedication and construction of Telephone Alley adjacent to this project shall be required at the time of development;

 

12.                     All perimeter roadways shall be fully repaired after construction;

 

13.                     Double occupancy of bedrooms shall be prohibited;

 

14.                     The project will construct a minimum parking ratio of .75 spaces per bedroom, and pay the fee in-lieu for the remaining parking space per bedroom requirement in order to meet the full 1.05 parking spaces per bedroom requirement;

 

15.                     The project will provide an annual report of the number of students vs the number of non-student residents by ratio of bedrooms; and

 

16.                     The project shall meet the Green Building Standard Silver Program.