Legislation Details

File #: Res. 2026-129R    Version: 1 Name:
Type: Resolution Status: Individual Consideration
File created: 6/1/2026 In control: City Council
On agenda: 8/5/2026 Final action:
Title: Consider approval of Resolution 2026-129R, approving the award of a Construction Contract to Harper Brothers Construction, LLC, for the Airport Taxilane Project, for the rehabilitation of apron pavement and associated taxilane improvements in the amount of $2,192,315.00; contingent upon the contractor's timely submission of sufficient bonds and insurance in accordance with the City's construction contract documents for the Project and concurrence in the award of the Project from the Texas Department of Transportation; authorizing the City Manager, or her designee, to execute the contract on behalf of the city; and declaring an effective date.
Attachments: 1. Resolution, 2. Project Location Map, 3. Engineer Recommendation, 4. 2026-041 Bid Tabulation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA CAPTION:

Title

Consider approval of Resolution 2026-129R, approving the award of a Construction Contract to Harper Brothers Construction, LLC, for the Airport Taxilane Project, for the rehabilitation of apron pavement and associated taxilane improvements in the amount of $2,192,315.00; contingent upon the contractor's timely submission of sufficient bonds and insurance in accordance with the City's construction contract documents for the Project and concurrence in the award of the Project from the Texas Department of Transportation; authorizing the City Manager, or her designee, to execute the contract on behalf of the city; and declaring an effective date.

Body

Meeting date:  August 5, 2026

 

Department:  Engineering/CIP; Director Shaun Condor

 

Amount & Source of Funding
Funds Required:
  $2,192,315

Account or Project Number (C = CIP funds):  C101 & C113

Funds Available:  Yes

Account Name:  Airport - Taxilanes &  Airport - Various State/Fed Fund

 

Fiscal Note:
Prior Council Action: Res No. 2025-70R authorizing City to request reimbursement from TXDOT for 90% of the cost of the Airport Taxilane project in an estimated amount not to exceed $1,800,000. Res No. 2025-78R placing the firms Garver, LLC, and Michael Baker International, LTD, on the list of qualified general aviation engineering services firms for various City projects.

City Council Strategic Initiative:  [Please select from the dropdown menu below]

Public Safety, Core Services & Fiscal Excellence

Choose an item.

Choose an item.

 

Comprehensive Plan Element (s): [Please select the Plan element(s) and Goal # from dropdown menu below]

Arts and Culture - Choose an item.
Economic Development - Choose an item.
Environment & Resource Protection - Choose an item.

Housing + Neighborhoods - Choose an item.
Land Use + Community Design and Character - Choose an item.
Parks & Public Spaces + Health, Safety & Wellness - Choose an item.
Transportation - Choose an item.

Core Services

Not Applicable

Master Plan
: [Please select the corresponding Master Plan from the dropdown menu below (if applicable)]
Airport Master Plan


Background Information:

On June 4, 2026, 2 bids were received for the Taxilanes Repairs project IFB # 2026-041. Harper Brothers Construction, LLC was the apparent low bidder with a base bid of $853,670 plus bid schedule #1 of $1,338,645 for a total award of $2,192,315. Based on their qualifications and references, they appear to be qualified to perform the work of this project.

 

This project proposes to rehabilitate portions of the existing concrete apron pavement at San Marcos Regional Airport. Other items of work include reconstruction of an existing asphalt taxilane, pavement markings, aircraft tiedown replacement, and a small area of emulsified asphalt slurry seal surface treatment. Striping will be included as needed to delineate the newly rehabilitated surfaces of the proposed taxilanes across the concrete ramp area. 

 

City funds will be used for the base bid repair work and grant funding will cover up to 90% of the Bid Schedule #1 work. After contract award, staff will negotiate a change order with the contractor to maximize any additional grant funding and reduce the cost associated with the base bid as recommended by the design engineer.  The bids have been submitted to the Texas Department of Transportation (Aviation Division) for review and concurrence is expected in September.  The contract award will not be finalized until TXDOT approves the bids and finalizes Airport Project Participation Agreement (APPA).

 

The proposed construction is needed because it will enhance safety by significantly reducing foreign object debris (FOD) potential that is currently a significant issue across the ramp area. The benefit of this construction is that areas of deteriorated concrete pavement will be repaired so that the surface is improved for use by aircraft.

 

Construction is anticipated to start in November 2026 and end by summer of 2027.

 

Council Committee, Board/Commission Action:
Click or tap here to enter text.

Alternatives:

Click or tap here to enter text.


Recommendation: 

Staff recommends approval of this item.